Case Study: Hoxton, Shoreditch Traditional Render

The Problem

The architects required a traditional render to match what was previously installed at the location prior to the development.

The Solution

We achieved a traditional finish using K Rend basecoat as well as stainless steel reinforcement mesh to

Job Size

350m2

Year

2018